Imperial College accommodation tower update

Work at Imperial West Block F continues to progress well, with the team on the installation of the lift core elements, working from cradles and utilising the tower crane, currently at level 30 and pictured below. With Health and Safety always at the forefront of our minds, and recent bulletins from LFL reporting oversized element stillages blowing over in high winds, we have taken the added precaution of drilling and fixing M16 eyebolts into the floor slab either side of where the stillage goes, strapping them down with 2t ratchet straps to stop any movement. The team are doing an awesome job, watch this space for further updates as the project continues.

view further details.